Mouse over image to zoom

Mailflow Systems Sorter, Open Back; 70 Sorting Pockets 15”D without Plexi Doors

SN6048C
The industry's leading product line offers everything you need for your corporate mail center including sorters, tables, cabinets, carts and more.
Open-Back Sorters are typically used where mail is passed through ­ sorted on one side and collected by the recipient on the other.

• All sorters are 15" deep with 14" deep sorting shelves. Adjust on 1/2"H increments.
• Sorting shelves have thumb cuts and labeling flanges on both front and back of shelves
Availability: 1 Available Color(s)
Shipping: Standard lead times may be impacted due to the current worldwide supply chain interruption. Lead time, 5 to 8 weeks
Was: $6,031.00
Sale: $3,769.38
Save: 37%
Save: $2,261.62
Qty:

Description

Mailflow Systems Sorter, Open Back; 70 Sorting Pockets 15”D without Plexi Doors

Open-Back Sorters are typically used where mail is passed through – sorted on one side and collected by the recipient on the other.

  • All sorters are 15" deep with 14" deep sorting shelves. Adjust on 1/2"H increments
  • Preconfigured models, designated by the letter “C” are available, or build-your-own by specifying empty sorter designated by the letter “E”, 12” deep shelving available in the “build-your-own” format only and adding components
  • For smoked Plexiglas, add 10% of list and an "S" suffix to standard Plexiglas door sorter, ie SN4824EPS
  • Pricing below is for sorters with and without doors
  • For assistance with custom Mailflow Systems configuration contact Space Planning service at spaceplanning@safcoproducts.com
  • All preconfigured models are standard with two columns of 11” wide shelves and the remaining columns with 12” wide shelves. You may receive extra shelves with sorters.

 

 

 

Dimensions 60x48x15 Weight 285#

Details

  • SN6048C
  • SN6048C
  • Safco
  • 1 Available Color(s)
  • New

Categories

Shipping Information

  • Item Requires Shipping
  • Standard lead times may be impacted due to the current worldwide supply chain interruption. Lead time, 5 to 8 weeks

Customer Reviews

Comment Total Reviews (0)

Write the First Review!

You must login to post a review.